Phase I of Fireplace Project Complete

So the first phase of the fireplace project is officially complete. Last week, I ran out of cement backer board and ended up buying a second sheet this week. I also removed the floor tiles on the sides and left it bare (eventually, before flooring, I’ll make sure it is level enough.

I left the slate in the hearth area as you can see below.

Fireplace Phase I

 

What I’m planning on doing is now instead of using Joint Compound to give that part of the wall a smooth finish, I’m going to be using a cement product. I got the idea from this site (there were some more cement type ideas too) and had contemplated doing the same thing but thought the JC would do the same job.

I ended up changing my mind because of the heat factor from the fireplace. It won’t get uber hot to melt the joint compound, at least I don’t think it would but still, since I opted for cement backer board, I thought using this Ardex stuff was the way to go. So yeah, I just placed an order for some Ardex SD-M on Friday. I’m getting the white cement and figured I could add a little bit of my Benjamin Moore Flora paint to it.

Here is another link that inspired me to use Ardex. This is from YouTube. http://www.youtube.com/watch?v=30LxxLdAkzA.

If you’re wondering about the slate that forms the hearth, my plan is to use that cement micro topping over it so it creates one uniform piece. If it works, it will be awesome because then I won’t have to worry about buying and laying tile. 🙂

The stuff should come in before next weekend so I’ll update more then.

The final piece will be the zinc. If all goes well, I should have a new fireplace before the end of July.

 

Advertisements